Flood Cleanup Turned Nightmare
After the 2011 river flooding, Water Street was a mess—wet concrete chunks mixed with debris, and crews couldn't get dumpsters emptied fast enough. The stench of stagnant water made every delay worse. We saw crews losing days waiting for haulers who couldn't handle the volume.
We rolled in with our 10-yard concrete-specific dumpsters and DEP-approved hauling rigs. Within 12 hours, we'd cleared three full loads of waterlogged concrete without a single spill. The site foreman had his crew back on schedule by lunch the next day.
You guys saved our bacon when nobody else could move fast enough.
Jim R., Site Foreman


